← Back to all articles

What Are the 16 TPM Losses? A Plant Head’s Practical Guide

A plain-English guide to the losses hiding in equipment time, work organisation and production resources.

By Snehasis Dutta, Founder, ArcheNex AI14 min read

On a Monday shift change at a mid-sized component plant, a supervisor tells the plant head that the same three machines caused yesterday’s shortfall. He said much the same thing three weeks ago. Nobody wrote it down either time.

The 16 major losses in Total Productive Maintenance (TPM) give a plant a shared way to name what’s going wrong across its equipment, its people’s work and its resources. In the usual discrete-manufacturing framework, that’s eight equipment losses, five manpower losses and three losses around materials, energy and consumables. Think of it as a diagnostic checklist, not a rulebook. Each plant should define the categories in words that fit its own process and data.

You’ve probably met the six big losses used in OEE. They cover the equipment side well. The 16-loss view is wider. It makes you ask where time, labour hours, material, energy or tooling are being used up without producing anything good.

This guide explains each loss with a simple example, gives you a way to measure it, and ends with a short assessment you can run at shift handover. The scenarios and sums are illustrations, not measured plant results.

The 16 losses at a glance

GroupLosses
Equipment (8)1 Breakdown · 2 Setup and adjustment · 3 Cutting-tool replacement · 4 Start-up · 5 Minor stoppages and idling · 6 Reduced speed · 7 Quality defects and rework · 8 Shutdown
Manpower (5)9 Management · 10 Motion · 11 Line organisation · 12 Internal logistics · 13 Measurement and adjustment
Resources (3)14 Yield · 15 Energy · 16 Die, jig and tool

Labels and boundaries shift a little between TPM references and industries. Some sources group the resource losses as energy, materials and consumables; others name die, jig and tool losses on their own. Pick one local loss dictionary and stick to it, so an event gets classified once and can be compared fairly.

Why losses stay hidden

A CNC operator notices the surface finish drifting, tweaks an offset, scraps a few pieces and carries on. Over several shifts, people make the same small adjustment on the same machine. Each one feels too minor to report, so the shared cause (a worn tool, say) stays invisible until someone connects the dots.

Nobody has to be hiding anything for this to happen. A quick recovery disappears into routine work. A short stop doesn’t trigger an incident report. A monthly energy or material bill arrives far too late to tell you which shift or process condition drove the use. A common loss vocabulary makes these small things easier to record and investigate.

The machining example above is made up, to show how small events get lost when records are scattered. It isn’t evidence of how often this happens or what it costs.

The eight equipment losses

These affect the time and output you get from machines and production systems. Some show up in OEE, others only in a wider look at equipment time. Don’t put the same event into two categories when you add things up.

1

Breakdown loss

What it is: Unplanned equipment failure that stops or seriously disrupts production.

How to measure: Record start and finish time, the asset, the failure mode, the output affected and the repair time. If your loss dictionary puts waiting for parts or support somewhere else, keep that separate.

Example: A pump fails and the line stays down until the seal is replaced.

2

Setup and adjustment loss

What it is: Time lost changing a machine or process from one product, spec or operating condition to another, including the adjustments before production settles.

How to measure: Measure from the agreed start of the changeover to the first conforming, stable run. Track planned and unplanned adjustments separately.

Example: A press changeover drags on because the die alignment needs repeated correction.

3

Cutting-tool replacement loss

What it is: Time and output lost swapping cutting tools or similar consumable tooling during production. This is different from the broader die, jig and tool breakage or consumption in loss 16.

How to measure: Log how often tools are changed and how long it takes, the reason, the tool life, and any scrap or slowdown that follows.

Example: A machining centre keeps stopping because inserts wear out sooner than expected.

4

Start-up loss

What it is: What you lose during start-up or restart, before the process reaches stable, conforming production.

How to measure: Track the time and the nonconforming output from start or restart to the point you’ve defined as stable.

Example: After a planned shutdown, a line needs warm-up and adjustment before it makes good product.

5

Minor stoppages and idling loss

What it is: Short interruptions or idle spells that get cleared quickly and often never reach the breakdown records.

How to measure: Count the events and add up the duration by machine, reason and shift. Set a local duration threshold and apply it the same way every time.

Example: A sensor trips, a conveyor halts briefly, the operator resets it and carries on.

6

Reduced-speed loss

What it is: The gap between the speed you’re actually running and a validated ideal or standard speed for the same product and conditions.

How to measure: Compare actual cycle time or output rate with a documented, achievable standard. Split by product and operating condition.

Example: A filler runs below its validated rate because of recurring flow instability.

7

Quality-defect and rework loss

What it is: Time, material and capacity eaten up by defects, rework and rejects during normal production.

How to measure: Count defects and rework separately. Where you can, record first-pass yield, defect type, quantity and time.

Example: A batch needs rework after a process parameter drifts.

8

Shutdown loss

What it is: Production time you don’t have because of scheduled shutdowns or other planned periods when the equipment isn’t loaded, according to your plant’s loading-time definition.

How to measure: Show planned shutdown categories apart from unplanned downtime, and say clearly whether each one sits inside the OEE loading-time denominator.

Example: A line is unavailable during a planned plant-wide maintenance shutdown.

The five manpower losses

These describe productive labour time lost to delays, unnecessary effort or the way the work is set up. They’re not a verdict on anyone’s effort. Look at the method, the information, the layout, the material supply, the staffing and the line balance around the work.

9

Management loss

What it is: Waiting because a decision, instruction, approval, piece of information or bit of support wasn’t there when it was needed.

How to measure: Record the task that was waiting, the people affected, the start and end time, and the missing input.

Example: An operator waits for a quality disposition before restarting.

10

Motion loss

What it is: Unnecessary movement by people while doing a task, beyond what the agreed method needs.

How to measure: Watch a few representative cycles and note the walking, reaching, searching or repeated handling. Check what you saw with the operators.

Example: An assembler walks across the cell to fetch a gauge they use all the time.

11

Line-organisation loss

What it is: Loss from poor work distribution, line balance, method design or coordination between connected operations.

How to measure: Compare work content and cycle times across stations. Record blocking, starving and imbalance by product mix.

Example: One station keeps piling up work while the next one waits.

12

Internal-logistics loss

What it is: Labour and production time lost moving, supplying, finding or handling material inside the facility.

How to measure: Log material-related waits, replenishment trips, handling steps and shortages by area and shift.

Example: A line pauses because the next container hasn’t arrived from the supermarket.

13

Measurement and adjustment loss

What it is: Time spent on checks and process adjustments that better process capability, measurement design or standardisation could cut down.

How to measure: Record how often you check, how long adjustments take, repeat measurements and the process conditions around them. Never drop a required quality or safety check without formal approval.

Example: An operator keeps sampling output and nudging a setting because the process drifts.

The three resource losses

These capture waste in material yield, energy use and tooling or consumables. Track them with production context. A monthly total on its own rarely points to a practical cause.

14

Yield loss

What it is: Material input that doesn’t become conforming, saleable output: scrap, trim, process loss or excess giveaway.

How to measure: Compare material in with good output out, on one consistent basis (mass, count or cost). Split by product and process.

Example: A cutting process produces avoidable offcuts.

15

Energy loss

What it is: Energy used without adding value: avoidable idling, leaks, inefficient conversion or needless heat loss.

How to measure: Relate metered energy to good output or operating time. Use sub-metering or temporary measurement where it’s worth it, and adjust for product and conditions.

Example: Compressed air keeps running in an empty area.

16

Die, jig and tool loss

What it is: Loss tied to dies, jigs, fixtures and tools: breakage, early wear, damage, loss or excess consumption. Some TPM references group these with consumables.

How to measure: Record issue and return, tool life, damage, how often things are replaced, the downtime and the product impact. Classify routine cutting-tool changes the same way as loss 3.

Example: A fixture gets damaged in handling and has to be repaired before production restarts.

How the 16 losses relate to OEE

OEE is usually calculated as Availability × Performance × Quality. It measures equipment effectiveness, built from defined production time, operating rate and good output. The 16-loss framework goes further than the six familiar equipment losses by adding more equipment-time categories, plus manpower and resource losses.

OEE componentTypical loss connectionWorth watching
AvailabilityBreakdowns and setup/adjustment usually cut available operating time.Whether planned shutdown counts depends on your agreed loading-time definition.
PerformanceMinor stops, idling and reduced speed usually cut output while the equipment is scheduled to run.Choose and validate an ideal cycle or rate for each product.
QualityDefects, rework and start-up rejects reduce good output.Decide where start-up loss ends and in-process quality loss begins.
Beyond OEEManpower, material yield, energy and tooling losses need their own measures.A strong OEE number doesn’t prove that labour or resources are being used well.

Your classification and formulas have to match the standards your plant has chosen. And don’t count the same event twice, once in OEE and again in a separate loss-cost analysis.

A practical way to measure a loss

Start with something you can repeat. You can sharpen the precision later. Consistent definitions and traceable evidence beat a fancy dashboard fed with shaky inputs.

  1. Define the boundary. Say what counts, what doesn’t, and which time or resource denominator applies.
  2. Capture the event close to where it happens. Note the date, shift, asset or area, product, event type, duration or quantity, and a short reason.
  3. Keep fact and explanation apart. “Line stopped for 7 minutes” is an observation. “Operator error” is a claim about cause, and it needs investigating.
  4. Use a sensible unit. Time for stoppages, events per shift for repeat stops, units or mass for yield, energy per good unit for energy, and labour-hours for manpower.
  5. Check the baseline with the people involved. Talk to operators, maintenance, quality and production. Is the data representative? Do any categories overlap?
  6. Prioritise on impact, frequency, how controllable it is, risk, and how much you trust the data. Turn it into money only once the assumptions and rates are agreed.
  7. Give it an owner, an action and a review date. Then measure again using the same definition after the change.

Simple measurement examples

LossStarting measureExample (illustrative only)
Minor stopsEvents and total stop minutes per shift12 events × 2 minutes = 24 stop minutes in the observed shift.
Reduced speedActual rate against the validated standardStandard 60 units/min; observed average 54 units/min during defined running time.
YieldGood output against material inputRecord kilograms issued, good kilograms, and categorised scrap for the same batch.
MotionUnnecessary travel or handling you can observeCount repeated tool-retrieval trips across representative cycles.
EnergyEnergy use per good outputMetered kWh ÷ good units, for a comparable product and operating period.

These sums show how a measurement is built. They aren’t benchmarks, targets or savings claims.

A five-minute self-assessment for plant heads

At shift handover, ask one question: “What slowed us down today that didn’t make it into a report?” Write down the answers for a week, across different shifts. Then map each one to the 16 categories, and don’t force a fit when the evidence is unclear.

Then go through these questions. Answer yes, partly or no, and jot down an example for each.

  • Do we use written definitions for each loss we track?
  • Can supervisors name our recurring minor stops and how long they last?
  • Do we tell planned shutdown, breakdown and setup time apart?
  • Do we compare actual speed with a validated standard, product by product?
  • Can we see defect, rework and start-up losses separately?
  • Can we see waiting, motion, material supply and line-balance problems?
  • Do we relate material and energy use to good output?
  • Does every priority loss have an owner, an action and a review date?

Use your answers to start a conversation, not to score yourself. Pick one repeated loss, give it a clear owner and a baseline you can measure, then run a focused improvement. The first week is for learning what your plant can observe consistently, not for claiming a plant-wide saving.

Turning observations into action

  1. Choose one machine, line or process boundary for the first review.
  2. Confirm the event definition and collect a short baseline across representative shifts.
  3. Use a Pareto view to find the frequent or costly categories, then dig into causes with the people who do the work.
  4. Try a countermeasure at a manageable scale, and note any effect, side effect or change in operating conditions.
  5. If it works, update the standard, visual control or maintenance routine, and keep watching the loss.

Where PlantXure fits

A loss framework only helps when what people observe becomes visible, comparable and actionable. PlantXure can help bring plant observations into one organised loss-management workflow, so teams can review repeat issues, assign follow-up and tie shop-floor signals to improvement priorities.

Start with records your team already trusts, like shift notes, downtime logs or quality records, and decide what to capture digitally as your definitions mature. A tool should support your loss dictionary and review rhythm. It shouldn’t replace operator judgement, process knowledge or checking the data.

If your plant is ready to make recurring losses easier to review, a focused pilot on one line or one loss category is a good way to try it. Begin with a clear baseline and one operational question, then see whether the workflow helps your team act on the evidence.

Frequently asked questions

What are the 16 losses in TPM?

They’re a framework for classifying production losses across eight equipment categories, five manpower categories and three resource categories: breakdown; setup and adjustment; cutting-tool replacement; start-up; minor stoppages and idling; reduced speed; quality defects and rework; shutdown; management; motion; line organisation; internal logistics; measurement and adjustment; yield; energy; and die, jig and tool losses.

Are the 16 TPM losses the same as the six big losses?

No. The six big losses focus on equipment effectiveness and are commonly used when analysing OEE. The 16-loss framework adds broader equipment categories plus manpower and resource losses. Exact labels vary by TPM reference and plant convention.

Does OEE measure all 16 losses?

No. OEE summarises availability, performance and quality for equipment. It doesn’t directly quantify every manpower, material, energy or tooling loss. Those need separate operational measures.

Which TPM loss should a plant address first?

Start with a loss that is frequent or costly, reasonably easy to measure, within the team’s influence and backed by enough evidence to investigate. The best first target depends on the plant. A small repeated loss can be easier to test than a big cross-functional one.

How can we measure a loss we have never tracked?

Define the event, observe it close to when it happens and record it in a consistent unit such as minutes, count, quantity or labour-hours. Check the definition with the people doing the work, then improve the precision over time.

Do we need sensors or advanced software to begin TPM loss tracking?

No. A clearly defined paper log or spreadsheet can give you an initial baseline. Digital tools help you organise and review information as the process matures, but the measurement method and the data quality still matter most.

Do all 16 losses apply to every industry?

The categories are a starting framework, not a claim that every loss matters equally everywhere. Discrete and process industries may define or prioritise them differently. Adapt the definitions to your process and keep your local rules consistent.

Can a plant have good OEE and still have significant losses?

Yes. OEE covers selected equipment effects. Labour organisation, material yield, energy use and tooling consumption can stay important even when OEE looks strong.

How do we avoid double counting?

Write down your category boundaries, time denominators and rules for shared events. For example, define how a cutting-tool replacement differs from setup time, and how start-up rejects differ from in-process quality defects.

Key takeaways

  • The 16 TPM losses give plant teams a shared vocabulary across equipment, manpower and resources.
  • The framework complements OEE. It doesn’t replace it, and no single score makes every loss visible.
  • Local definitions matter. Clear boundaries prevent gaps and double counting.
  • Begin with consistent observations, then prioritise on evidence, impact and your ability to act.
  • Use shift-handover questions to surface what routine reports miss, and turn the most useful signal into a measured improvement.

Sources

  1. JMAC TPM Global, “TPM Fundamentals – TPM 16 Major Losses”. tpm.jmac.co.jp/news/details/6515.html
  2. JMAC TPM Global, “Loss Zero is the Ultimate Partner for Management”. tpm.jmac.co.jp/news/details/6557.html
  3. Kaizen Institute, “Increasing Resource Efficiency” presentation (the 8 equipment, 5 labour and 3 energy/materials grouping). Slides (PDF)
  4. Japan Institute of Plant Maintenance, TPM Training Textbook. jipmglobal.com/pdf/TPM-Training-Textbook.pdf
  5. JIPM Global, TPM Award criteria (PDF). Link

The definitions here are paraphrased from these TPM references. Adapt them to the TPM standard your plant has adopted. This article is educational. It doesn’t prescribe one accounting treatment, OEE denominator or industry-specific loss list.

More articles